I tied off my tarp support lines directly to the tarp and move the figure 9 on the line depending on the pitch between trees.
Is there a better way to use the Figure 9's with a tarp? This is in reference to the support lines not the lines going to the ground. I thought someone mentioned tying the Figure 9 with a small piece of line to the tarp. Then tying a loop in one end of the loose longer line, pass the line around the tree, through the loop and back to the Figure 9.
What is your preferred method?
Thanks.
Bookmarks