I think your right Dale. After putting up the bolts I decided it would be best to just drill holes and use amsteel to hang from. As soon as I can I'm getting amsteel!
Type: Posts; User: jons4real
I think your right Dale. After putting up the bolts I decided it would be best to just drill holes and use amsteel to hang from. As soon as I can I'm getting amsteel!
Hey everybody, thank you very much for all the great tips and tricks. I decided to use I Bolts and attach them from the side and they are doing very well.
I figured that would be my best bet as well. Did you consider running the bolts the bolts strait up into the 2x6's? The thing about my beams is they are running the same way my hammock will be...
I have been looking around and found that all those little metal brackets can get pretty expensive, atleast more expensive than drilling a hole. But yes I will keep looking , thanks.
Thats a great idea thanks.
Hey all, So I recently moved and now have a basement! That means I'm hangin!
My basement has open 2x6 ceiling joist. Now I could just drill holes and loop my webbing through them but I'm not big...