Search:

Type: Posts; User: moimeme_81

Search: Search took 0.01 seconds.

  1. Replies
    19
    Views
    7,274

    by the way, the zeppelin use 47.9% less ropes...

    by the way, the zeppelin use 47.9% less ropes than the figure height which is 7.7% less than the alpine butterfly so they are pretty much the same in terme of rope usage...
  2. Replies
    19
    Views
    7,274

    this is why I wrote this: never had any...

    this is why I wrote this:



    never had any problem with amsteel for making any knot the only thing is that you have to adapt the knot to the rope...

    I don't think a knot is you know it then...
  3. Replies
    19
    Views
    7,274

    I might be wrong or just close minded but I think...

    I might be wrong or just close minded but I think that the zeppelin loop is kinda hard to remember... and if you had a slip with the butterfly knot, it might be because you didn't check it before or...
  4. Replies
    19
    Views
    7,274

    I just did the test again being more carful, I...

    I just did the test again being more carful, I ended up that keeping the same loop size the alpine butterfly use 43.5% less rope than the figure height (in line or on a bight will use the same...
  5. Replies
    19
    Views
    7,274

    the alpine would be better than the figure...

    the alpine would be better than the figure because if you don't use a loop in the middle the pressure will be put il line I mean that it's not gonna force the knot to open like a figure height would...
Results 1 to 5 of 5