It should; it's Dutch. He usually ships within 24 hours of an order, even this time of year.
Sewing it up ain't hard: cut it to length (add ~4" for the end seam allowance to the desired finished length), roll hem the long sides (that is, fold the edge of the fabric over twice at about 1/2" to 1" and run a stitch line through all three layers), and roll hem the short ends (make sure to backstitch for a stitch or three at the ends of this one, as it won't be crossed by another stitch line). Run your cord through the ends to gather and tie off like Knotty shows in
this thread. Attach suspension and ridgeline and you're good to go!
Hope it helps!
Bookmarks