Quote Originally Posted by PapaSmurf View Post
Simple, but it takes some setup. I've got sheets of Masonite laid on the floor in the workshop to form a 6' x 10' work area. The cut lines are drawn out with sharpie markers on the Masonite. The cutting is done with a hot knife by following the cut lines viewed right through the Tulle.

As the design changes, new lines are added. Problem becomes "which of the 47 lines should I follow?"
I think that hot knife sounds like 'da bomb. melting the sides together slightly would certainly help keeping the sides lined up for cutting.